We use the solution to run our applications and services.
IBM PowerVM offers robust virtualization with features like shared processor pools, dynamic partitioning, and active memory sharing for enhanced performance and cost management. It's tailored for critical industries that prioritize stability, performance, and seamless resource management in virtualization efforts.
| Author info | Rating | Review Summary |
|---|---|---|
| Data Center Manager at Family-bank | 5.0 | I use IBM PowerVM to run applications and services due to its stability, resilience, and reliability. However, its limited operating system compatibility is a challenge, alongside the difficulty in finding skilled personnel proficient in this technology. |
We use the solution to run our applications and services.
It offers stability, resilience, and reliability. They handle the workloads very easily.
The biggest challenge is the limited flexibility in operating system compatibility. PowerVM, for instance, supports only a select few operating systems, which can restrict the types of workloads deployed.
Many applications are incompatible with these IBM-approved operating systems, which is a significant limitation. Additionally, finding skilled personnel with proficient and hyper skills is challenging, as these skill sets are relatively rare. To address these challenges, organizations often rely on in-house expertise or engage external vendors specializing in these technologies to overcome skill gaps and operational hurdles.
I have been using IBM PowerVM for over ten years.
I rate the solution’s stability a ten out of ten.
If I need more power, I request additional resources, whether a memory upgrade or processing capabilities. During the ordering process, I specified that I needed a system where I could activate more processes than initially required. Therefore, I ordered more processing capacity than necessary, allowing me to activate only the required number through a simple code input. This flexibility is very advantageous for me and effectively meets my needs.
Around 1000+ people interact with the programs.
It's very highly scalable. I rate the solution's scalability an eight out of ten.
The initial setup is not straightforward. Once you set up, you hardly have to do anything. It keeps running without you having to go through it. Sometimes, deployment and mobility can become challenging. If Check Point could make its solutions lighter, it would reduce the need for extensive equipment shipping. Additionally, improving flexibility across operating systems is crucial. These enhancements could address these issues effectively.
The deployment can take up to a day or two for the initial setup. However, several other configurations and checks are required after the setup phase before it becomes fully operational. This process may extend from a day or two up to about a week before the system is fully operational and running smoothly.
The deployment process involves several steps. Initially, upon receiving the equipment, you unpack it and assemble the components. Next, you connect the necessary cables. Once assembled and connected, you begin with the HMC setup. After configuring the HMC, you deploy the servers themselves, setting up input-output equipment, creating partitions, and configuring necessary settings. Finally, you install the operating systems and any additional required software.
I rate the initial setup as seven out of ten, where one is difficult and ten is easy.
The product is very expensive.
Servers with high demand can always borrow resources from less busy servers. This flexibility reduces the need for very high server specifications and can lower costs. Instead of buying 10-20-50 servers, we initially opted for a costly one. The initial price may be high because quality doesn't come cheap.
It pays for itself due to its capability. One is sufficient instead of needing three or four system administrators because downtime is rare.
It requires very minimal maintenance. In normal operations, only one person is needed for updates, upgrades, and general management. However, at least a few people are needed for physical maintenance due to the heavy equipment involved.
We don't have to worry about Check Point because of its stability and predictability. My services are always up, except for major issues that might be caused by external factors. However, the system itself is consistently reliable.
Overall, I rate the solution a ten out of ten.
| Product | Mindshare (%) |
|---|---|
| IBM PowerVM | 2.4% |
| VMware vSphere | 18.2% |
| Hyper-V | 17.4% |
| Other | 62.0% |
| Company Size | Count |
|---|---|
| Small Business | 13 |
| Midsize Enterprise | 5 |
| Large Enterprise | 16 |
| Company Size | Count |
|---|---|
| Small Business | 124 |
| Midsize Enterprise | 35 |
| Large Enterprise | 95 |
IBM PowerVM stands out in the field of virtualization by providing dynamic allocation of processing power and memory through its shared processor pools and active memory sharing. It ensures high performance and stability, supporting Oracle licensing compliance and features like Live Partition Mobility for seamless migration. Users benefit from its robust administration and resource management capabilities, allowing for efficient handling of complex workloads and secure operations. However, users suggest improvements such as a GUI for better ease of use, robust clustering, and integration features akin to VMware vCenter, while noting the relatively high cost and limited Windows support.
What are the key features of IBM PowerVM?Users implement IBM PowerVM primarily in sectors such as banking and telecommunications, focusing on workload consolidation, SAP, and Oracle database management. Its dynamic partitioning and shared processor pools optimize performance and reduce costs, while RISC-based architecture with high clock speeds and memory bandwidth is ideal for both on-premises and cloud deployments.
IBM PowerVM was previously known as PowerVM.